Development of a technical project for the Sakstagala parish Ciscal village for water holding

The municipality of Signagala parish has launched the development of a technical project of the “Water farm in Rezekne municipality, Sakstagala parish”, which is performed by SIA “Ekolat”. The project is implemented in ERDF support activity 3.4.1. 1. “Development of water management infrastructure in populated areas with a population of up to 2000”, with European Structural Funds support of EUR 346 102, total project costs of 407 179 EURO.
The project includes the construction of a new artery drilling, the construction of a drinking water preparation station (q = 4,6 m3/h), the reconstruction of water supply networks (L = 1370 m), the old drilling. The construction of a biosewage treatment plant (q = 16 m3/dn) will be built from a new Ciskādu village. Technical solutions for the deployment and operation of sewage treatment plants are currently being sought. The construction of sewage networks (L = 1030 m) is also envisaged.
Overall, the implementation of the project will have a positive impact on the physical and anthropogenic environment of the Ciskskin village, reduce anthropogenic effects through the drainage to the Chetchora river, which is the tributary of the Rēzekne River, reduce the amount of pollution in the environment from environmental requirements for non-compliant stocktanks, which are the cause of eutrophication, eliminate potential sources of pollution, have a positive impact on the compliance of the environmental and nature protection requirements in the municipality of Sakstagala.
The reconstruction of the water pipeline will result in reduced drinking water leakage (losses of 52.41 TP1T, after project disposal – 32.61 TP1T), so that the amount of water used will decrease, the amount of water abstraction will decrease, calculated per consumer. The construction of a new artery and water preparation station will provide a quality water supply to the population of the village of Ciskad. The construction of sewerage networks and the construction of sewage treatment plants will result in waste water management in accordance with regulatory requirements.
The construction of sewerage networks will create preconditions for the elimination of septicians and savings vessels and reduce the number of individual sewerage septicians, thereby preventing potential surface water contamination by sewerage septic leaks.
Olga Muraviova
Sakstagala parish administration manager

Click to Listen highlighted Text!