Building facade finishing works

Cabinet Regulation No. 529 of 2 September 2014, “Building Regulations of Buildings”, determines the documentation necessary for the construction process. The type of documents to be submitted depends on the structure of the structures. The first group buildings are:
• Meat (one-storey building, including a roof and an auxiliary building with a building area of not more than 25 m2);
• non-residential buildings of non-urban and village areas, not intended for keeping animals, and auxiliary buildings (e.g. farm building, storehouse, barn, cellar, shelter, garage) with a building area of up to 60 m2;
a separate industrial single-deck building with a building area of up to 60 m2, including a container type building or construction product, except the building where the dangerous equipment is located
The third group buildings are:
• a building with more than five surface floors;
• a building with more than one underground floor;
a public building for more than 100 people to stay at the same time
• industrial production building with a total area of more than 1000 m2
• a warehouse building with a fire load of over 600 MJ/m2 or a total area of more than 2 000 m2.
The buildings of the second group comprise all other buildings not included in the first or third groups.
By proposing the renewal of the first (cities and villages), second or third group buildings, the renewal of the front facade – the replacement of all windows, the insulation of the facade, the insulation of the roof, the replacement of the roof cover, the warmth of the cellar or the glazing of the solders, without changing the outer wall placement – shall be submitted to the institution which fulfils the functions of the construction board:
• Part I of the completed attestation card if a simplified facade of the second or third group building is intended to be restored;
fill in part I of the explanatory memorandum if the first group buildings (towns and villages) are intended to be restored.
Such construction intention documents shall be developed by a certified construction specialist.
A person, when proposing any type of construction, shall append to the submission: documents certifying the right of ownership, possession or use, if the relevant information is not available in the State public registers; the authority of the initiator of construction, if the submission is submitted by an authorised person; co-ordination with third parties and other permits in the cases specified in these Regulations and other regulatory enactments.
Construction intention documents are not required:
• First group buildings for renovation of the facade, insulation of the facade, insulation of the roof, replacement of the roof cover, insulation of the cellar, if the building is not a national protected cultural monument and located outside the cities and villages;
• The construction of a first group building or a second group of one or two residential buildings, an auxiliary building or a non-residential building of a non-residential building (with the exception of State protected cultural monuments and buildings in cities and villages), without carrying out other construction works of the building's facade, if the conformity of the building's facade is ensured, the roof configuration and colour and the selected construction products shall ensure at least equivalent technical performance characteristics of the previous construction product if other requirements have not been specified in the local government building regulations.
Rēzekne Municipality Building Board

Click to Listen highlighted Text!