Sakstagala pagasta Ciskādu ciemā īstenos ūdenssaimniecības projektu
The reconstruction of the water pipeline will result in reduced drinking water leakage (losses of 52.41 TP1T, after project disposal – 32.61 TP1T), so that the amount of water used will decrease, the amount of water abstraction will decrease, calculated per consumer. The construction of a new artery and water preparation station will provide a quality water supply to the population of the village of Ciskad. The construction of sewerage networks and the construction of sewage treatment plants will result in waste water management in accordance with regulatory requirements.
The construction of sewerage networks will create preconditions for the elimination of septicians and savings vessels and reduce the number of individual sewerage septicians, thereby preventing potential surface water contamination by sewerage septic leaks.
Projekta īstenošana nodrošinās kvalitatīvu, normatīvajām prasībām atbilstošu ūdensapgādes (78,2%) un kanalizācijas (50,3%) pakalpojumu pieejamību Ciskādu ciema iedzīvotājiem, nodrošinās 100% pakalpojumu kvalitātes atbilstību visiem ūdenssaimniecības pakalpojumu lietotājiem, samazinās noplūdes daudzumu ūdensapgādes sistēmā.
The implementation of the project will have a positive impact on the image of the municipality as a whole and will make the business environment considerably more attractive and will improve the well-being and recreational opportunities of the population in the Ciscal village.
Olga Muraviova
Sakstagala parish administration manager